top of page

Nottingham Canal Underbridge 23

The Nottingham Canal Underbridge scheme required replacement of a two-span deck and removal of adjacent redundant decks.

Client: J Murphy & Sons
Discipline: Structural Engineering

The Nottingham Canal Underbridge scheme required replacement of a two-span deck and removal of adjacent redundant decks. The need to remove the ‘Up Newark’ bridge decks was driven by their life-expired condition, leading to poor track quality and constant heavy maintenance. The track was originally supported on long timber bearers which required frequent realignment for gauge clearance. An abnormal possession for the replacement of the bridges was planned for Christmas 2018 with design work commencing in the January.

Project Gallery

LOCATIONS:

Birmingham office

87 Caroline Street

Birmingham, B3 1UP

England, United Kingdom

0121 233 4786

Bristol office

Broad Quay House

Prince Street

Bristol, BS1 4DJ

Email: info@fjdconsulting.co.uk

© 2024 by FJD Consulting. 

GET IN TOUCH WITH US

 

We are always looking for challenging design projects to be part of and passionate engineers to be part of our team.

 

Our team would be happy to discuss any inquiries related to our services and careers. Let's talk.

 

FOLLOW US:

 

 

  • TikTok
  • Instagram
  • LinkedIn
  • Twitter
  • YouTube
bottom of page